This week we are starting to move the first of 4 classrooms we will be moving in the next 8 weeks. I also have to move two switch racks. They are in unlocked, student areas. Not a great plan for security. So I am thinking I can save a little money and not have to re-terminate the fiber ends by just passing the whole patch panel across the ceiling. A perfect plan that just got better as I traced the route I would take. That is until the last three feet from the rack. Two lines ran together, one continuing on to a farther rack. Some dumb shit ran one on each side of a pipe for my heating system. There is no way to get the panel out around it without disconnecting it at one end or the other. The end is more than 40 feet away on either end. Well fuck!
After thinking about drinking several beers, or shots, I think I have figured a way around it. A FREE way around it. That will make the boss happy. Maybe I can keep my job a little longer.
Other than that, not much this week. Doing karaoke tonight for the faithful few who still come out. Otherwise fuck 'em !
I'm out till next time.
Uncle P
No comments:
Post a Comment